An approval log is useful when an owner or operator needs to see who decided what, under which authority and with what follow-up. It becomes noise if it captures every routine task or records approvals after work is already complete. Define the decisions that matter before choosing a template or system.

Compare decision rights with the Feathers management approach, its operating platform, and contact with the team about reporting and owner oversight.

At a glance

  • Record decisions that cross an agreed authority or budget boundary.
  • Capture options, approver, date, rationale and follow-up.
  • Keep routine approvals proportionate and contracts authoritative.
Housekeeping trolley and floor-cleaning equipment in a hotel corridor.

Start with the authority matrix

Review the management agreement, budgets, delegations and current procedures to identify which decisions need owner approval, operator approval or a record only. The log does not create authority; it documents decisions within authority already granted.

Examples may include a change to approved scope, expenditure above a threshold, a service closure beyond an agreed period or an exception to policy. The exact list depends on the property and contract. Have qualified advisers review legal rights and obligations.

Set a threshold for recording

Capture decisions with financial, contractual, safety, guest-service or asset consequences that cross defined limits. A recurring low-risk purchase may need only the normal procurement record. A major variation or unplanned closure may need an explicit decision record.

Use thresholds to prevent two opposite problems: important decisions disappearing in email, and managers spending time logging routine actions. If staff cannot tell whether a decision belongs in the log, add a short example and escalation contact.

Record the information needed to understand it

A useful entry includes date, property, issue, decision requested, options considered, relevant cost or service impact, approver, authority basis, conditions and follow-up owner. Link to supporting evidence in a restricted system rather than copying sensitive files into the log.

Record what was known at the time and distinguish a forecast from an actual amount. If the decision changes, add a dated update instead of silently replacing the original entry. The history helps explain why the operation took a particular path.

Connect approvals to budgets and contracts

Link the decision to an approved budget line, contract clause, project reference or service level where relevant. Cornell’s hotel management-contract research describes how owner approval and review rights can differ across agreements; the property’s signed contract remains the source for its own rights.

A log entry should not substitute for a contract amendment, purchase order or formal notice when those are required. Define who checks the required document and where the final record lives. Consult legal and financial advisers for material deviations or disputes.

Make access and review proportional

Limit access to people who need to request, approve or audit decisions. Sensitive commercial, personnel or security details should remain in the appropriate restricted system. Set a retention and review approach consistent with the property’s policies and applicable requirements.

Review open actions, overdue decisions and repeated exceptions at an agreed cadence. A log that is never reviewed will not prevent recurring problems. Use a short dashboard or filter rather than asking every reader to inspect every entry.

Use the log to learn, not to shift blame

Look for repeated delays, unclear thresholds and common requests that could be delegated safely. If a decision was made outside the agreed authority, review why: was the matrix unclear, was there an emergency, or was approval unavailable? Then address the process and preserve a factual record.

Do not use an approval log to imply that an approver accepted risks that were never presented. Capture material assumptions and unresolved questions. The person making a recommendation and the person authorising it should remain clear.

Frequently asked questions

Should every owner-approved hotel expense be in the log?

Record decisions defined by the authority matrix, budget threshold or material service impact. Routine expenses may already have an adequate purchasing record. Avoid duplicating records without a clear oversight purpose.

Does a log change who has authority?

No. Authority comes from the contract, delegation and applicable rules. The log documents a decision and its basis; it does not replace a required contract amendment, notice or approval process.